The development of the electrification project of the Chisinau-Ungheni railway corridor, with subsequent interconnection of the entire railway corridor of the country for the development of a modern railway infrastructure, aligned with European requirements and the integration of railway networks with European ones
Report:
Year registered: 2024
Type:
Transport
Status:Registered
3SI countries proposing the project:
Moldova
Participating 3SI countries:
Partner countries:* not part of the 3Seas Initiative
Calendar of implementation:
To be determined
Budget:
To be determined
Financing sources:
To be determined